In today’s fast-paced construction world, speed and safety are two of the most important factors. Whether it’s a residential building, a commercial project, or infrastructure work, everyone wants construction that is quick, reliable, and strong. That’s where Ready Mix Concrete (RMC) plays a big role.
In this blog, we will explain how to use ready mix concrete in the right way to ensure faster and safer construction.
What Is Ready Mix Concrete?
Ready Mix Concrete is concrete that is manufactured in a batching plant using a controlled mix of cement, sand, aggregates, water, and admixtures. It is then transported to the construction site in a ready-to-use form using transit mixer trucks.
Unlike traditional site-mixed concrete, RMC is more efficient, consistent in quality, and helps speed up the construction process.
Benefits of Using Ready Mix Concrete
Before we dive into how to use it, let’s understand why RMC is beneficial:
- Saves time by avoiding on-site mixing
- Reduces material wastage
- Improves site safety and cleanliness
- Ensures consistent concrete quality
- Reduces the need for skilled labor
How to Use Ready Mix Concrete Effectively
Here are some practical tips to ensure you use RMC the right way:
1. Plan Your Requirements in Advance
Before placing an order:
- Know the grade of concrete you need (e.g., M20, M25, M30)
- Calculate the required quantity in cubic meters
- Decide the slump value based on workability needs
Planning helps avoid delays, reorders, or wastage.
2. Choose a Trusted Supplier
Always order from a reliable ready mix concrete supplier in Surat who:
- Follows quality control procedures
- Provides accurate mix designs
- Delivers on time
Check customer reviews, service history, and plant certifications before finalizing.
3. Ensure Site Is Ready for Concrete Pouring
Before the truck arrives:
- Keep the formwork and reinforcement ready
- Make sure workers and tools are available
- Ensure there is a clear path for the transit mixer to reach the site
This preparation helps in smooth and quick concrete placement.
4. Use Within 90 Minutes of Mixing
Ready mix concrete should be used within 90–120 minutes of mixing to maintain its strength and workability. Avoid delays in pouring to prevent concrete setting inside the truck.
5. Do Not Add Water on Site
Adding water to adjust the mix at the site can:
- Weaken the concrete
- Reduce its durability
- Affect the final structure
If needed, request slump adjustment from the supplier beforehand using approved admixtures.
6. Use Concrete Pumps for High-Rise or Difficult Access Areas
If your site is on an upper floor or hard to reach:
- Use a concrete pump or boom pump
- This helps pour concrete quickly and safely with less labor
7. Follow All Safety Guidelines
Ensure workers:
- Wear helmets, gloves, boots, and masks
- Keep the site clean and organized
- Stay away from the transit mixer chute during operation
Good safety practices reduce accidents and create a smooth workflow.
8. Cure the Concrete Properly
After pouring, start curing the concrete after 6–8 hours to gain full strength. Continue curing for at least 7 to 14 days using:
- Water spray
- Wet cloth covering
- Curing compounds
Curing is essential for crack-free and durable construction.
Real-World Applications of RMC
Ready Mix Concrete is ideal for:
- Residential slabs, footings, and columns
- Commercial buildings and parking lots
- Roads, bridges, and flyovers
- Precast concrete elements
- Industrial foundations and flooring
Conclusion
Using ready mix concrete is a smart and efficient way to build strong, long-lasting structures. When used correctly, it helps you:
- Finish projects faster
- Keep the site clean and safe
- Achieve better construction quality
Whether you’re building a home or a high-rise, ready mix concrete is the key to modern, safe, and time-saving construction.
FAQs – How to Use Ready Mix Concrete
Q1. Can Ready Mix Concrete Be Used for Small Projects?
Yes, many suppliers offer small loads for home construction, garden paths, and driveways.
Q2. How is Ready Mix Concrete Transported?
It is delivered using transit mixer trucks that keep the concrete mixed and fresh during transport.
Q3. What if I Need more Time to Pour?
Inform your supplier. They may adjust the mix with retarders to increase the setting time. Never add water on-site.
Q4. Is RMC Suitable for High-rise Buildings?
Yes, with pumping equipment, RMC can be easily poured on upper floors.
Q5. How Do I Know the Concrete is of Good Quality?
Check the delivery slip, slump test, and take a sample cube for lab testing if needed.